Home / How We Charge

Every price, in writing, before we start.

Here's how we price the planning and the work itself — office moves, crew work, build-outs, and facilities — and exactly what every proposal shows. The number for your project comes in a written proposal before anything starts.

Two professionals reviewing a budget worksheet between laptops
By Service

How each kind of work is priced

Moves, crews, and projects each have a pricing model that fits how the work actually runs. Many projects use more than one.

Office Moves & Relocations

Fixed bid from a walkthrough

We walk both spaces, count the workstations, and check the docks, elevators, and building rules. Then we price the move as one fixed bid: crew, trucks, materials, IT disconnect and reconnect, and the project lead running move day. If the scope is what we walked, the bid is the bill.

Crew Work & Small Jobs

Hourly crew rate

Furniture reconfigurations, install help, one-floor shuffles, and storage runs are hard to scope tightly, so they run on an hourly crew rate. You get the crew size and estimated hours in writing first, and a cap if you want one.

Build-Out Management

Fixed fee or percentage

Managing a build-out is priced as a fixed fee per phase or a percentage of project cost, whichever fits the scope better. Long-running programs can move to a monthly fee. Construction and furniture show as their own lines.

Decommissioning

Fixed fee after the lease

We read your surrender clause first, then price the lease-end as a fixed fee: disposition plan, restoration oversight, removal, and handback documentation. Furniture resale and donation credits show as offsets on the same proposal.

Facilities Management

Monthly retainer

A predictable monthly fee scaled to your square footage and sites, covering the program: maintenance calendar, vendors, compliance, and reporting. Repairs are priced separately, and anything over a limit you set waits for your approval.

Advisory

Hourly, capped on request

Focused scopes billed by the hour: bid reviews, workletter and lease-surrender reviews, contract negotiations, project rescues, and second opinions. Estimated up front and invoiced with detail.

What Sets the Price of a Move

Six things we look at on the walkthrough

Office moves aren't priced by the pound or the mile. These are what actually move the number, so you can see where yours will land before we arrive.

Headcount & workstationsThe biggest driver: desks, chairs, files, and equipment per person.
Building accessFloors, freight elevator reservations, dock time, and each building's move rules and insurance requirements.
TimingMost offices move after hours or over a weekend so the business keeps running. That costs more than a weekday move.
IT & specialty itemsWorkstation disconnect and reconnect, servers, printers, AV, safes, and anything that needs crating.
FurnitureMoving what you have, installing new systems furniture, or disposing of what isn't coming.
Distance & storageAcross the street or across the metro, and anything held in storage between move-out and move-in.

No surprise lines. If something can't be priced yet, like a building's after-hours elevator fee, the proposal says so and shows how it will be priced.

One Team, One Proposal

What you'll always see

Management and the work itself, on one proposal, itemized line by line — so there's never a number you didn't approve.

Itemized, in writingProject management, crew work, and third-party costs shown as separate lines before we start.
Changes approved firstScope changes are priced and approved in writing before they're billed — in your portal, time-stamped.
One accountable teamThe people who plan your project are the people who deliver it. No blame between vendors.
Sample proposal

Office relocation — 48 people, Uptown to Las Colinas

Your proposal shows the dollar amount on every line.
01
Project managementMove plan, building coordination, vendor schedule, and a project lead on site for move day
Fixed
02
Move crew & trucksAfter-hours move, Friday evening through Saturday
Fixed bid
03
Packing & protectionCrates, labels, and floor, wall, and elevator protection at both buildings
Fixed
04
IT disconnect & reconnect48 workstations, 6 printers, and conference room AV
Fixed
05
Furniture reinstallExisting systems furniture, reconfigured to the new floor plan
Fixed bid
06
Third-party costsBuilding after-hours elevator fee and certificate of insurance requirements
Shown separately
One total, approved before anything is booked.Changes priced and approved in writing first.
 Prism 3Separate PM + vendorsMover or contractor alone
Who's accountableOne team, start to finishSplit across contractsOnly their slice
PricingItemized, in writing, firstSpread over several quotesInside one quote
HandoffsNone — same team throughoutAt every phaseYou manage them
After move-inFacilities management on retainerA new contractNot offered

Want the number for your project?

Tell us the scope and we'll set up a walkthrough. You'll get a written, itemized proposal before anything starts.

Request a Proposal
FAQ

Common questions

How does Prism 3 charge?

It depends on the work: fixed bids for office moves, priced after a walkthrough; an hourly crew rate for small or open-ended jobs; a fixed fee or percentage of project cost for build-out management; fixed fees for decommissioning; monthly retainers for facilities management; and hourly rates for advisory. Every proposal itemizes management and work separately.

How much does an office move cost?

It depends mostly on headcount and building access. Workstations, floors and freight elevators, after-hours timing, IT, and furniture drive the number, not weight or mileage. We walk the space and send a fixed, itemized bid before anything is booked.

Do you charge hourly or a flat price for moves?

Most office moves are a fixed bid after a walkthrough. Smaller or open-ended crew work, like reconfigurations, install help, and storage runs, runs on an hourly crew rate, estimated in writing first and capped if you ask.

Is project management included when you do the move?

Yes. Every move we run has a project lead planning it and running move day. Management shows as its own line, so you can see what the planning costs versus the labor.

Are there costs beyond the proposal?

Your proposal shows three kinds of lines: project management, work our crews deliver, and third-party costs like construction, furniture, building fees, and permits. All of it is itemized before we start, and changes are approved in writing before they are billed.

Do you take small projects?

Yes. Small moves and crew work run on the hourly crew rate, and focused advisory, like reviewing a workletter, leveling contractor bids, or auditing a surrender clause, runs hourly too. If a project doesn't need us, we'll say so.

Will you cap an hourly engagement?

Yes. Ask, and the cap goes in the agreement. If we hit it, we finish the scope or come back to you with options — the meter doesn't quietly keep running.

Why do you publish how you charge?

Because surprises are what clients remember. If you can see how the price is built before you sign, the number you approve is the number you pay.

What does a proposal look like?

Two to four pages: scope, exclusions, schedule, every line with its price, and what happens if scope changes. If anything in it surprises you later, we've failed at the one thing this page promises.